CV Danawa Indra Mitra Sentosa Brand Color Codes

with HEX, RGB, CMYK, Pantone & RAL

  • Guardsman Red: #BD0000
  • White: #FFFFFF
  • Woodsmoke: #0C0D0E
CV Danawa Indra Mitra Sentosa color logo

What are the CV Danawa Indra Mitra Sentosa brand color codes?

The CV Danawa Indra Mitra Sentosa colors are Guardsman Red, White, Woodsmoke. The CV Danawa Indra Mitra Sentosa brand color codes in HEX, RGB, CMYK, and Pantone formats can be found below. The following table provides standardized color codes across multiple systems, including HEX, RGB, and CMYK, along with Pantone (PMS), RAL, and NCS (Natural Color System). HEX and RGB formats are specifically intended for digital applications such as web design and user interfaces, while CMYK values are optimized for professional printing purposes.

Color Names & Codes of the CV Danawa Indra Mitra Sentosa Brand

Guardsman Red
Color Codes
Hex
#BD0000
RGB
189, 0, 0
CMYK
0, 100, 100, 26
White
Color Codes
Hex
#FFFFFF
RGB
255, 255, 255
CMYK
0, 0, 0, 0
Woodsmoke
Color Codes
Hex
#0C0D0E
RGB
12, 13, 14
CMYK
14, 7, 0, 95

*The color values above are not explicitly specified in the CV Danawa Indra Mitra Sentosa brand guidelines, but represent the closest approximations based on the official color references available.

The CV Danawa Indra Mitra Sentosa brand colors are Guardsman Red, White, Woodsmoke. The Guardsman Red color code for the brand is HEX: #BD0000, RGB: 189, 0, 0, CMYK: 0, 100, 100, 26.  The White color code for the brand is HEX: #FFFFFF, RGB: 255, 255, 255, CMYK: 0, 0, 0, 0.  The Woodsmoke color code for the brand is HEX: #0C0D0E, RGB: 12, 13, 14, CMYK: 14, 7, 0, 95.

CV Danawa Indra Mitra Sentosa Brand Image with Color Palette

CV Danawa Indra Mitra Sentosa brand color palette

Download CV Danawa Indra Mitra Sentosa Color Palette

Download the CV Danawa Indra Mitra Sentosa brand color palette image, which includes all official HEX codes in a single visual format designed for digital use. These HEX values are recommended for applications such as web design, UI components, and digital presentations. For professional print production or spot color requirements, refer to the Pantone® (PMS) and RAL codes listed above, which are standardized for accurate color reproduction in physical materials.

Related Brands